Comité Français des Barrages et Réservoirs

Barrage de Chevril (Tignes)

Accueil > Doi > 2017 > doi_cfbr_shf_colloque2017_a01

doi_cfbr_shf_colloque2017_a01

doi_cfbr_shf_colloque2017_a01

Evacuateur de crues de secours du barrage de Titaaviri 2


Géraldine MILESI, Yanis OUKID (TRACTEBEL)

Éditeurs :

  • Société Hydrotechnique de France - SHF - ISBN : 979-10-93567-16-7
  • Comité Français des Barrages et Réservoirs - CFBR - ISBN 979-10-96371-04-4

Colloque "Hydraulique des barrages et des digues" - 29 et 30 novembre 2017 - Chambéry, France
Année d’édition 2017

Téléchargement : Actes du colloque

Title : Emergency spillway of Titaaviri 2 dam

Résumé
Le barrage de Titaaviri 2 est un ouvrage en remblai de hauteur 27 m situé sur l’île de Tahiti en Polynésie française. Il a été mis en service en 1990 et est exploité par le Maître d’ouvrage, Marama Nui, filiale d’Electricité de Tahiti. Lors de sa conception, la crue de dimensionnement de son évacuateur latéral était de 277 m3/s. Suite à la révision des études hydrologiques et à l’évolution des critères de conception, les études de réhabilitation de 2011 ont conduit à considérer une crue de projet de 215 m3/s correspondant à une période de retour de 5 000 ans. La capacité du déversoir était donc suffisante pour évacuer cette crue, par contre les revanches par rapport aux niveaux des écoulements, que ce soit en crête du barrage ou dans le coursier de l’évacuateur étaient trop réduites. La modélisation hydraulique 2D a en effet montré des surhauteurs importantes au niveau du bajoyer rive droite en raison d’une dissymétrie du coursier. Par ailleurs, se posait la problématique du risque d’éboulement de la falaise à laquelle l’évacuateur est accolé en rive gauche, des éboulements ayant déjà eu lieu proche du barrage en aval et des blocs de pierres tombant régulièrement dans l’évacuateur. Pour se prémunir contre un tel risque et améliorer la sécurité de l’ouvrage existant, il a ainsi été décidé de mettre en place un parapet en crête du barrage et de réaliser un évacuateur de secours sur son parement aval ainsi qu’une zone tampon entre les 2 évacuateurs. Cette zone permet de récupérer les éventuels déversés de l’évacuateur principal et d’absorber tout ou partie d’un éventuel éboulement.

Abstract
Titaaviri 2 is a 27 m high earthfill hydroelectric dam, located in the island of Tahiti, French Polynesia. It was put into service in 1990 and is exploited by the owner, Marama Nui, subsidiary of Electricity of Tahiti. Its spillway was initially design for a 277 m3/s flood. Thereafter, the revision of the hydrological studies and the evolution of the design criteria, led to consider a peak design flood of 215 m3/s, corresponding to a 5 000 year flood. The capacity of the spillway was thus sufficient to evacuate the design flood, but the freeboards with regard to the sidewalls of the spillway channel and the crest of the dam were insufficient. Indeed, the 2D hydraulic modeling showed an important increased of the water surface level on the right sidewalls, due to asymmetrical hydraulic conditions in the channel. Besides, there is a risk of rockslide from the cliff located on the left abutment of the spillway, a major rockslide having already occurred downstream of the dam and some rocks falling regularly in the channel spillway. As a result, it was decided to heighten the crest of the dam, to build an emergency spillway on the downstream face of the dam as well as a buffer zone between the two spillways. This zone allows to collect the potential overflowing of the main spillway and to absorb all or part of a potential rockslide. The emergency spillway was designed so that over the period of restoration of the main spillway further to a collapse (1 year), the probability of occurrence of the design flood of the emergency spillway is of the same order as that of the 5 000 year flood over the period of dam operation (50 years). It allows evacuating a 100 year flood in the case of a total obstruction of the main spillway. In normal condition, it starts flowing only from the 100 year flood. It is constituted by 10 independent steps, 25 m wide and 3 m high. The rehabilitation works were carried out from 2013 till 2016.

Citation
MILESI Géraldine, OUKID Yanis. Evacuateur de crues de secours du barrage de Titaaviri 2. In Colloque "Hydraulique des barrage et des digues". Chambéry : CFBR-SHF - 29,30 novembre 2017. ISBN 979-10-93567-16-7 & 979-10-96371-04-4. p. 3-15. doi : 10.24346/cfbr_shf_colloque2017_a01